Location

Kaskass - LB

Scope

Rehabilitation

Client

Catalytic Action / Himaya

BU/A sqm

3,000

Architect

Catalytic Action

Delivery Date

2021

Prior to the rehabilitation of the park, the area was run down with old swings and a destroyed plastic play structure. CTI was awarded this fast track project, and started with the site preparation removing all the damaged play items, grading and compacting the soil and installed paving tiles. The design included the casting of a unique curved concrete amphitheater and long tables and benches with geometrical volumes inside the core of the structure. Different play item were fabricated in-house and some on site including swings, climbing nets, speaking pipes, and a large stainless-steel slide.